Reconstruction from two (2) lane open ditch to four (4) lanes with concrete, curb and gutter, sidewalks, and storm drainage system. This project also includes:

  • Acquiring 100 foot right-of-way
  • Realigning Bryan Road at FM 2218
  • Constructing two new bridges over Dry Creek
  • Replacing and up-sizing the water and sanitary sewer lines
  • Evaluate installation of reclaimed water line

The Spacek Road Sewer Lift Station and Spacek Road Sewer Line projects will be done in conjunction with this project.