twitter
832-595-3300

Old Richmond Road/Jennetta and Avenue F Drainage

This project includes reconstructing the existing roadway by removing the existing asphalt pavement and base and replacing with a 24 foot wide concrete pavement section from 8th Street to Lane Drive. The improvements include the addition of at least one turn lane and the potential need for additional right-of-way. Drainage system improvements will include open ditches with no sidewalks, curb or gutter.

This cost estimate includes engineering and construction costs. Right-of-way costs are not included.