Spacek Road Improvements – Phase Two

In conjunction with Bryan Road, Spacek Road will be reconstructed from two (2) lane open ditch to four (4) lanes with concrete roadway, concrete curb and gutter, sidewalks, and underground storm drainage system. Phase two includes, reconstructing Spacek Road from Bryan Road to the northern end of the Oaks of Rosenberg subdivision. Replacing and up-sizing the water and waste water lines will occur in conjunction with this road improvements project.